|
|
I�ve had my 95 GMC truck for about 3 years. It has never worked as good as it Does now. I was having DTC Codes Come up every Time I Drove it....29,36,78,99 ect.. I looked for a year or so for some site that would shed some light on the issues. I even... ...read more From: Jon C.
I have had a problem with my truck stalling for two years. I have change the fuel pump,removed the fuel tank and flush it out. I change the fuel filter on a regular basis. I went to the dealer in the area, and he told me it was the injector pump, at the... ...read more From: Ritchie M.
|
Duramax
>
Turbos & Components
>
Reman Garret Turbo GMC Duramax LBZ Engine 2006-2007)
|
Reman Garret Turbo, GM Duramax LBZ 2006-2007. For Pick-ups, vans, Kodiak and Topkick T-560 w/Duramax
- 100% brand new turbocharger vane actuator
- 100% brand new journal and thrust bearings
- Each turbo is balanced using state of the art OEM equivalent balancers
- Each turbo is end of line tested to ensure desired performance
- Each turbo is packaged with the necessary components to install
- 12-month, unlimited mileage warranty
|
|
Reman Garret Turbo GMC Duramax LBZ Engine 2006-2007)
|
|
Model: ssd-9005
|
$1,348.39
|
|
Note: core deposit of $300.00 is required
|
United States and Canada - All Deliveries to the United States and Canada will be made by UPS. You will be quoted the shipping cost and presented with delivery options at the time of checkout. See our shipping calculator for more information.
|
|
|
|
|
NEW Garret Turbo, GM Duramax LBZ 2006-2007
This is a remanufactured 6.6L Duramax Turbocharger for GM Duramax LBZ engine applications.
- This hydraulically actuated turbocharger undergoes a complete remanufacturing process developed by experienced engineers.
- Each turbo is carefully disassembled and thoroughly cleaned using different cleaning methods.
- Once the parts are cleaned, they are visually inspected and measured by qualified technicians. The rotating components are balanced individually and then again as an assembly.
- The cartridges are assembled using all new critical components.
- The assembled cartridge is then high speed tested in a Vibration Sorting Rig (VSR) which spins the turbo in excess of 90,000 RPM while it measures any amount of unbalance throughout the RPM range.
- The hydraulic actuators are remanufactured by qualified technicians and tested prior to the final assembly process. All remanufacturing takes place in the USA.
| Applications: |
2006 - 2007 GM 6.6L Duramax LBZ Pickup/Sierra
2006 - 2007 GM 6.6L Duramax LBZ Van
2006 - 2007 GM 6.6L Duramax LBZ Topkick |
| Reference Numbers: |
8980117351, 8980033661, 759622-0002 |
Does not include mounting hardware.
Garret Turbo p/n R759622-9005, GM p/n 98011735
NOTE: Special order, 3-4 week delivery
Install kit recommended p/n ssd-172-784-0131
WARNING!! CHANGE ENGINE OIL PRIOR TO TURBOCHARGER INSTALLATION. NOT DOING SO MAY RESULT IN PREMATURE TURBOCHARGER FAILURE.
TURBOCHARGER INSTALLATION INSTRUCTIONS INSPECT – LINES AND FITTINGS
- Visually inspect the oil supply and drain lines for kinks, clogging, or other restrictions.
- Check exhaust manifold, oil supply, and oil drain line flanges for cracks or rust. Verify flatness on surface areas. Remove any old gaskets or any gasket material present on these surface areas.
- Check air cleaner; air cleaner duct; and the exhaust manifold for any foreign objects.
ANY FOREIGN OBJECTS LEFT IN THESE AREAS CAN FATALLY DAMAGE THE TURBOCHARGER AND MAY CAUSE DAMAGE TO THE ENGINE! INSPECT AND PREP– NEW TURBOCHARGER
- Ensure that no dirt or foreign objects have entered the turbocharger openings.
- Place new o-ring and gaskets on oil inlet side of turbo, use clean engine oil to lubricate o-rings before assembly.
TURBOCHARGER INSTALLATION
- Install turbocharger, mount both rear and front side, using high temperature nickel anti-seize lubricant to the bolt threads.
- Position all wire retainers and install bolts.
- Lubricate turbocharger by pouring clean engine oil into the oil inlet hole of the turbo. With your fingers, spin the compressor wheel several times to coat the turbocharger bearings with oil. Pour more oil into the oil inlet hole to top it off. There may be some drainage, but this is of no concern.
- Connect the oil supply line, position the oil feed tube and install oil inlet bolts.
- Connect the air cooler duct inlet, installed with v-band clamp.
- Connect the air exhaust duct, installed with v-band clamp.
- Check for proper crankcase oil level.
- Test to prevent “engine start – fuel shut off”: crank the engine for a short duration of 15 seconds until the gauge shows an oil pressure build up.
- Start the engine and let it idle for 5-10 minutes. (Do not rev the engine during this time)
- Inspect installation for any oil leaks.
|
|
|
|
|
|